{"id":7473,"date":"2024-06-14T09:05:05","date_gmt":"2024-06-13T23:05:05","guid":{"rendered":"https:\/\/woodcentral.com.au\/?p=7473"},"modified":"2024-10-21T20:19:14","modified_gmt":"2024-10-21T10:19:14","slug":"under-armours-hq-why-mass-timber-is-key-to-fast-track-build","status":"publish","type":"post","link":"https:\/\/woodcentral.com.au\/under-armours-hq-why-mass-timber-is-key-to-fast-track-build\/","title":{"rendered":"Under Armour&#8217;s HQ: Why Mass Timber is Key to Fast-Track Build!"},"content":{"rendered":"\n<p>Eight years after Baltimore-based Under Armour bought waterfront land for a new global headquarters, it has a move-in date!<\/p>\n\n\n\n<p>The first wave of corporate workers will relocate in November from its Tide Point headquarters in nearby Locust Point to a purpose-built, five-story building nearly complete and, importantly, two months ahead of schedule! The secret? A mass timber design that allowed crews to reduce bottlenecks and deliver the project at a rapid pace!<\/p>\n\n\n\n<p>&#8220;It&#8217;s a very significant investment for us, in our teammates, our community and our enterprise,&#8221; said Kathy Blessington, Under Armour&#8217;s vice president of real estate, in an interview. &#8220;Being a Baltimore-based and founded company, we take a lot of pride in what we&#8217;re doing here.&#8221;<\/p>\n\n\n\n<p>The 26,012 square metre building is made from cross-laminated timber <a href=\"https:\/\/woodcentral.com.au\/mass-timber-could-surge-25-fold-fueled-by-us-south-high-rise\/\" target=\"_blank\" rel=\"noreferrer noopener\">as part of a wave of mass timber projects now sweeping the American South.<\/a> <a href=\"https:\/\/www.gensler.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Spearheaded by Gensler<\/a>, it is setting new standards for combining cutting-edge design, sustainability, and efficient construction techniques.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"640\" src=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-1024x640.jpg\" alt=\"birds eye 2000x 1667949634\" class=\"wp-image-18423\" srcset=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-1024x640.jpg 1024w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-300x188.jpg 300w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-768x480.jpg 768w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-1536x960.jpg 1536w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-696x435.jpg 696w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-1068x668.jpg 1068w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-1920x1200.jpg 1920w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-672x420.jpg 672w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-1320x825.jpg 1320w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634-600x375.jpg 600w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/birds-eye-2000x_1667949634.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">A birdseye view of the new global HQ transforming the Locust Point waterfront near downtown Baltimore. (Photo Credit: Renders from Gensler)<\/figcaption><\/figure>\n\n\n\n<p>Architects are buzzing with excitement, according to JJ Rivers, <em><a href=\"https:\/\/www.gensler.com\/projects\/under-armour-global-headquarters\" target=\"_blank\" rel=\"noreferrer noopener\">Principal and Director of Gensler<\/a><\/em>. &#8220;It&#8217;s like being a kid in a candy shop for architects,&#8221; Mr Rivers said<em>, adding <\/em>that the project is &#8220;setting a new standard for what a truly sustainable corporate campus looks like.&#8221;<\/p>\n\n\n\n<p>&#8220;We talk about these sustainability systems all the time, but very infrequently, they all get employed,&#8221; Mr Rivers said, &#8220;I think this building will help lead the region towards a more sustainable future.&#8221;<\/p>\n\n\n\n<h6 class=\"wp-block-heading\">CLT is the main driver in the net-zero building<\/h6>\n\n\n\n<p>The building&#8217;s distinct form, which resembles a sports stadium with a front fa\u00e7ade canopy crafted from an innovative fluorine-based polymer, is already turning heads.<\/p>\n\n\n\n<p>However, the standout feature is its cross-laminated timber structure, an unusual material choice for such a high-profile project in the city.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-embed-handler wp-block-embed-embed-handler wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"youtube-embed\" data-video_id=\"jjddFBKiD60\"><iframe loading=\"lazy\" title=\"NEW 2023 Under Armour Global Campus | Baltimore, MD\" width=\"696\" height=\"392\" src=\"https:\/\/www.youtube.com\/embed\/jjddFBKiD60?feature=oembed&#038;enablejsapi=1\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<\/div><figcaption class=\"wp-element-caption\"><em>The development is part of a new Under Armour Global Campus. Footage courtesy of <a href=\"https:\/\/www.youtube.com\/@ImeUmoh\">@ImeUmoh<\/a><\/em><\/figcaption><\/figure>\n\n\n\n<p>The Teammate Building 2 (TMB2) building targets a net zero by significantly reducing embodied and operational energy &#8211; aiming to achieve <em><a href=\"http:\/\/ugreen.io\/understanding-leed-certification-levels\/\" target=\"_blank\" rel=\"noreferrer noopener\">LEED-Platinum certification<\/a><\/em>. <\/p>\n\n\n\n<p>In addition, it uses a 9 x 9-metre grid design to standardise beam depths and columns to maximise efficiency, reduce time and keep costs down.<\/p>\n\n\n\n<p>According to Mr Rivers, increased capacity has helped drive down the cost of mass timber over the past five years to where it is only a small premium over concrete or steel. Another &#8216;plus&#8217; is mass timber can be &#8220;significantly quicker&#8221; to erect than concrete or steel, Rivers says.<\/p>\n\n\n\n<h6 class=\"wp-block-heading\">Under Armour&#8217;s commitment to &#8216;Act Sustainably&#8217;<\/h6>\n\n\n\n<p>Built in accordance with Under Armour&#8217;s commitment to &#8216;Act Sustainably,&#8217; the building will be a hub for collaboration. <\/p>\n\n\n\n<p>Alongside interior spaces designed to foster teamwork, it will host a flagship retail store open to the public and state-of-the-art sports facilities &#8211; nestled within a landscape that encourages pedestrian movement through the campus and activates the waterfront.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"637\" src=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central-1024x637.jpeg\" alt=\"\" class=\"wp-image-7476\" srcset=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central-1024x637.jpeg 1024w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central-600x373.jpeg 600w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central-300x187.jpeg 300w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central-768x477.jpeg 768w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central-696x433.jpeg 696w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central-1068x664.jpeg 1068w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central-676x420.jpeg 676w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central-356x220.jpeg 356w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/06\/Under-Armour-unveils-sustainable-design-for-teammate-headquarters-Wood-Central.jpeg 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">The new building meets Under Armour&#8217;s commitment to &#8216;Act Sustainably&#8217; and will qualify for LEED Platnum certification. (Image credit: Gensler)<\/figcaption><\/figure>\n\n\n\n<p>The new complex will also have a network of photovoltaic roof panels, a geothermal system, sunshades for solar heat reduction, a rainwater harvesting system, an HVAC that provides 100% fresh air intake, and an energy recovery system.<\/p>\n\n\n\n<h6 class=\"wp-block-heading\">Mass Timber at the forefront of Gensler Research Institute<\/h6>\n\n\n\n<p>While the project is one of the architect&#8217;s largest mass timber commissioned, <a href=\"https:\/\/woodcentral.com.au\/how-architects-use-ai-tech-to-pinpoint-buildings-for-retrofit\/\" target=\"_blank\" rel=\"noreferrer noopener\">Gensler has been involved in over 100 projects, representing millions of square metres.<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1057\" height=\"805\" src=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/F2DC95C9-3940-4FD3-BAEA-5783E0F4951E.jpeg\" alt=\"F2DC95C9 3940 4FD3 BAEA 5783E0F4951E\" class=\"wp-image-18558\" srcset=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/F2DC95C9-3940-4FD3-BAEA-5783E0F4951E.jpeg 1057w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/F2DC95C9-3940-4FD3-BAEA-5783E0F4951E-300x228.jpeg 300w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/F2DC95C9-3940-4FD3-BAEA-5783E0F4951E-1024x780.jpeg 1024w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/F2DC95C9-3940-4FD3-BAEA-5783E0F4951E-768x585.jpeg 768w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/F2DC95C9-3940-4FD3-BAEA-5783E0F4951E-696x530.jpeg 696w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/F2DC95C9-3940-4FD3-BAEA-5783E0F4951E-551x420.jpeg 551w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/F2DC95C9-3940-4FD3-BAEA-5783E0F4951E-80x60.jpeg 80w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/06\/F2DC95C9-3940-4FD3-BAEA-5783E0F4951E-600x457.jpeg 600w\" sizes=\"auto, (max-width: 1057px) 100vw, 1057px\" \/><figcaption class=\"wp-element-caption\">According to Gensler Principal and Director JJ Rivers, mass timber can be erected significantly quicker than concrete or steel.<\/figcaption><\/figure>\n\n\n\n<p>According to Mr Rivers, mass timber has been at the forefront of the<em><a target=\"_blank\" href=\"https:\/\/www.gensler.com\/gri\" rel=\"noreferrer noopener\"> Gensler Research Institute<\/a><\/em>, a network of researchers looking at new design ideas. &#8220;I would say the industry has caught up on construction methodologies and technologies,&#8221; he said. &#8220;We&#8217;re seeing a lot more clients wanting to explore it.&#8221;<\/p>\n\n\n\n<p>Gensler is one of the world&#8217;s largest architecture firms. <a target=\"_blank\" href=\"https:\/\/woodcentral.com.au\/how-architects-use-ai-tech-to-pinpoint-buildings-for-retrofit\/\" rel=\"noreferrer noopener\">Last year, <\/a>Wood Central revealed that the design firm now uses big data to pinpoint projects suitable for retrofit and mass timber construction.<\/p>\n\n\n\n<p>&#8220;The biggest exterior challenge for us was creating a building with 360-degree visibility, which feels connected (to the community) and represents the brand,&#8221; Mr Rivers said.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>For more information about Under Armour&#8217;s new HQ, <a target=\"_blank\" href=\"https:\/\/www.baltimoresun.com\/2024\/06\/13\/under-armour-move-to-baltimore-peninsula-hq-november\/\" rel=\"noreferrer noopener\">click here for a special feature in the Baltimore Sun<\/a>. To find out why mass timber construction systems are faster and lighter than traditional steel-and-concrete building systems, <a target=\"_blank\" href=\"https:\/\/woodcentral.com.au\/clt-floors-excel-mass-timber-beats-steel-in-building-footprint\/\" rel=\"noreferrer noopener\">click here.<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Eight years after Baltimore-based Under Armour bought waterfront land for a new global headquarters, it has a move-in date! The first wave of corporate workers will relocate in November from its Tide Point headquarters in nearby Locust Point to a purpose-built, five-story building nearly complete and, importantly, two months ahead of schedule! The secret? A [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18422,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_wpscppro_dont_share_socialmedia":false,"_wpscppro_custom_social_share_image":0,"_facebook_share_type":"","_twitter_share_type":"","_linkedin_share_type":"","_pinterest_share_type":"","_linkedin_share_type_page":"","_instagram_share_type":"","_medium_share_type":"","_threads_share_type":"","_google_business_share_type":"","_selected_social_profile":[],"_wpsp_enable_custom_social_template":false,"_wpsp_social_scheduling":{"enabled":false,"datetime":null,"platforms":[],"status":"template_only","dateOption":"today","timeOption":"now","customDays":"","customHours":"","customDate":"","customTime":"","schedulingType":"absolute"},"_wpsp_active_default_template":true},"categories":[51,3,38,35,39],"tags":[],"ppma_author":[69],"class_list":{"0":"post-7473","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-americas","8":"category-architecture","9":"category-architecture-and-design","10":"category-case-studies","11":"category-mass-timber"},"authors":[{"term_id":69,"user_id":1,"is_guest":0,"slug":"woodcentral","display_name":"Wood Central","avatar_url":{"url":"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/02\/MASTER-BRAND-MARK_POS_RGB-e1676449549955.jpg","url2x":"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/02\/MASTER-BRAND-MARK_POS_RGB-e1676449549955.jpg"},"0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/posts\/7473","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/comments?post=7473"}],"version-history":[{"count":8,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/posts\/7473\/revisions"}],"predecessor-version":[{"id":18560,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/posts\/7473\/revisions\/18560"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/media\/18422"}],"wp:attachment":[{"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/media?parent=7473"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/categories?post=7473"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/tags?post=7473"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/ppma_author?post=7473"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}