{"id":9670,"date":"2024-03-18T16:52:28","date_gmt":"2024-03-18T05:52:28","guid":{"rendered":"https:\/\/woodcentral.com.au\/?p=9670"},"modified":"2024-10-21T20:19:46","modified_gmt":"2024-10-21T10:19:46","slug":"architect-alliance-pushes-timber-rich-stadiums-for-2032-games","status":"publish","type":"post","link":"https:\/\/woodcentral.com.au\/architect-alliance-pushes-timber-rich-stadiums-for-2032-games\/","title":{"rendered":"Lang Park to Host Brisbane Olympics: Now for Timber Stadiums!"},"content":{"rendered":"\n<p>A committee reviewing Brisbane&#8217;s 2032 Olympic recommendation to scrap the controversial $2.7 billion Gabba redevelopment in favour of a new, &#8220;marginally more expensive&#8221; stadium at Victoria Park, Herston, has been rejected by the Queensland Premier. <\/p>\n\n\n\n<p>Instead, the Premier will push to retrofit and rebuild Lang Park, which will be used for the Opening and Closing ceremonies, upgrade the Gabba (for cricket) and QE2 stadium (for athletics) in Nathan.<\/p>\n\n\n\n<p>The Victoria Park new build, proposed by the committee, was understood to cost $3.4 billion, $700 million more than the Gabba rebuild, which had already exploded in cost three times since its first announcement.<\/p>\n\n\n\n<p>However, this afternoon, Premier Steven Miles confirmed that Lang Park (known as Suncorp Stadium), the Gabba, and QE2\u2014used during the 1982 Commonwealth Games\u2014would all be upgraded for the Games.<\/p>\n\n\n\n<p>Premier Miles said, &#8220;I don&#8217;t agree with that recommendation.&#8221; Adding that \u201cWith Queenslanders struggling with housing costs, I cannot justify spending $3.4 billion on a new stadium.&#8221;<\/p>\n\n\n\n<p>&#8220;I know I said I would do what the Quirk review recommended, but I cannot support that option,&#8221; with $1 billion of infrastructure spending to be allocated &#8220;half-half&#8221; between the Gabba, Lang Park with $1.6 billion to be spent converting QE2 into a 40,000 seat stadium.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"573\" src=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-1024x573.jpg\" alt=\"Earlier this week, Brisbane Lions CEO Greg Swann said the proposal Victoria Park (rather than Gabba) location for a new stadium should be taken seriously. (Photo Credit: Supplied by ARCHIPELAGO)\" class=\"wp-image-16260\" srcset=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-1024x573.jpg 1024w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-300x168.jpg 300w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-768x430.jpg 768w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-1536x860.jpg 1536w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-696x390.jpg 696w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-1068x598.jpg 1068w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-1920x1075.jpg 1920w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-750x420.jpg 750w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-1320x739.jpg 1320w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328-600x336.jpg 600w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/11\/b5a11d0f701bbc4abe90930c2690f9c0-fotor-20240318134328.jpg 1944w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Earlier this week, Brisbane Lions CEO Greg Swann said the proposal for Victoria Park, backed by the Quirk committee, should be taken seriously. (Photo Credit: Supplied by ARCHIPELAGO)<\/figcaption><\/figure>\n\n\n\n<p>Yesterday, Premier Miles, who replaced outgoing premier Anastasia Palaszczuk late last year, spoke of his &#8220;good working relationship&#8221; with newly reelected Brisbane Lord Mayor Adrian Schrinner.<\/p>\n\n\n\n<p>Mayor Schrinner, who last year sensationally quit the games committee, which he called a &#8220;pointless talkfest&#8221;, is understood to have a better relationship with Premier Miles than his predecessor. <\/p>\n\n\n\n<p>&#8220;The Lord Mayor and I have a good working relationship,&#8221; Premier Miles said, adding that &#8220;we don&#8217;t agree on everything, but we do agree the Brisbane 2032 games will be the best ever, and we&#8217;re determined to do what we need to deliver that.&#8221;<\/p>\n\n\n\n<h6 class=\"wp-block-heading\">Premier Miles vows for &#8216;cleaner, greener and more sustainable games&#8217;<\/h6>\n\n\n\n<p>It comes as last year, Wood Central reported that Premier Miles, who attended COP28 in Dubai, <a href=\"https:\/\/woodcentral.com.au\/brisbane-olympics-7b-pledge-for-greener-venues-whats-next\/\">has pledged to use carbon-friendly construction materials in the $7 billion-plus infrastructure build.<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"663\" height=\"491\" src=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/03\/image-24.png\" alt=\"image 24\" class=\"wp-image-16259\" srcset=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/03\/image-24.png 663w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/03\/image-24-300x222.png 300w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/03\/image-24-485x360.png 485w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/03\/image-24-567x420.png 567w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/03\/image-24-80x60.png 80w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/03\/image-24-600x444.png 600w\" sizes=\"auto, (max-width: 663px) 100vw, 663px\" \/><figcaption class=\"wp-element-caption\">Mick Stephens, Timber Queensland CEO, with Queensland\u2019s new Premier Steven Miles who is directly responsible for the Olympics and Paralympic Games Infrastructure.&nbsp;(Photo Credit: Mick Stephens)<br><br><\/figcaption><\/figure>\n\n\n\n<p>According to the Premier, who is directly responsible for overseeing the Olympic Delivery Authority and managing the $7 billion in infrastructure projects, the climate-positive commitment \u201cwill go a long way in helping us achieve that goal while delivering the infrastructure our growing state needs.\u201d<\/p>\n\n\n\n<p>\u201cNot only will this help protect our environment,\u201d he said, but \u201cit will help strengthen the Queensland economy for the future.\u201d<\/p>\n\n\n\n<p>The pledge comes after Wood Central reported that the Paris Olympic Committee has dubbed 2024 to be the year that <a href=\"https:\/\/woodcentral.com.au\/paris-leads-way-in-low-carbon-timber-venues-for-2024-olympics\/\">&#8220;Steel is Out, with Wood the story of the Games!&#8221;<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-1024x576.jpg\" alt=\"To mark 100 years since the last Paris Olympic Games, organisers have published the official Olympic Poster, with a number of timber-venues in picture. (Photo Credit: Supplied by Paris 2024 Olympics)\" class=\"wp-image-15821\" srcset=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-1024x576.jpg 1024w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-300x169.jpg 300w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-768x432.jpg 768w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-1536x864.jpg 1536w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-696x392.jpg 696w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-1068x601.jpg 1068w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-747x420.jpg 747w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-640x360.jpg 640w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-1320x743.jpg 1320w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306-600x338.jpg 600w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2024\/01\/1920x1080_cmsv2_c2c22b5a-09c7-5045-b718-94c6fa74f4ab-8284864-fotor-2024030613306.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">To mark 100 years since the last Paris Olympic Games, organisers have published the official Olympic Poster, with several timber-venues in picture. (Photo Credit: Supplied by Paris 2024 Olympics)<\/figcaption><\/figure>\n\n\n\n<p>More than 95% of the Paris venues will be existing or temporary, with only the athletes\u2019 village and aquatics centre constructed from scratch \u2013 a model being promoted for all future games, including Brisbane 2032,&nbsp;<a href=\"https:\/\/www.skynews.com.au\/australia-news\/grim-outlook-for-gabba-rebuild-as-olympic-games-powerbroker-john-coates-calls-to-abandon-27-billion-upgrade\/news-story\/ce5d89ae9482d739e89eb54a724baf1c?nk=8486e4091d33daeae242cb0cc1a2acb4-1709693811\" target=\"_blank\" rel=\"noreferrer noopener\">where there is a major push to retrofit venues from the 1982 Commonwealth Games.<\/a><\/p>\n\n\n\n<p>Already, the French government is issuing \u20ac200 million in subsidies to projects using wood and other biomaterials. It is pushing for 50% of French timber buildings to be constructed from locally grown timber in a bid to double the timber construction market over the next five years.<\/p>\n\n\n\n<p>\u201cIndustrial equipment in France is undersized,\u201d Dominique Cottineau, director of the Wood Construction Industry Union (UICB), <a href=\"https:\/\/www.bloomberg.com\/news\/features\/2024-03-09\/paris-summer-olympics-will-be-a-modest-showcase-of-wood-architecture'\">told Bloomberg. <\/a>But the trajectory is changing, and we will build with much more wood than before.\u201d<\/p>\n\n\n\n<p>Global Design Alliance pushes Brisbane organisers to use timber!<\/p>\n\n\n\n<p>Meanwhile, the world&#8217;s leading architects have revealed their vision for a series of stadiums made from timber.<\/p>\n\n\n\n<p>The alliance includes HKS, Buchan and Nikken Sekkei and reminds the Queensland Government of the &#8220;once in a generation&#8221; opportunity to deliver instantly recognisable and &#8220;distinctly Australian&#8221; stadiums.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"862\" height=\"575\" src=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/An-artists-impression-of-the-new-Gabba-from-the-outside-for-the-2032-Olympic-Games.-Image-Credit-Supplied-by-Queensland-Government-Wood-Central.webp\" alt=\"An artists impression of the new Gabba from the outside for the 2032 Olympic Games. (Image Credit Supplied by Queensland Government)\" class=\"wp-image-9675\" srcset=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/An-artists-impression-of-the-new-Gabba-from-the-outside-for-the-2032-Olympic-Games.-Image-Credit-Supplied-by-Queensland-Government-Wood-Central.webp 862w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/An-artists-impression-of-the-new-Gabba-from-the-outside-for-the-2032-Olympic-Games.-Image-Credit-Supplied-by-Queensland-Government-Wood-Central-600x400.webp 600w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/An-artists-impression-of-the-new-Gabba-from-the-outside-for-the-2032-Olympic-Games.-Image-Credit-Supplied-by-Queensland-Government-Wood-Central-300x200.webp 300w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/An-artists-impression-of-the-new-Gabba-from-the-outside-for-the-2032-Olympic-Games.-Image-Credit-Supplied-by-Queensland-Government-Wood-Central-768x512.webp 768w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/An-artists-impression-of-the-new-Gabba-from-the-outside-for-the-2032-Olympic-Games.-Image-Credit-Supplied-by-Queensland-Government-Wood-Central-696x464.webp 696w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/An-artists-impression-of-the-new-Gabba-from-the-outside-for-the-2032-Olympic-Games.-Image-Credit-Supplied-by-Queensland-Government-Wood-Central-630x420.webp 630w\" sizes=\"auto, (max-width: 862px) 100vw, 862px\" \/><figcaption class=\"wp-element-caption\">An artists impression of the proposed Gabba from the outside for the 2032 Olympic Games. This design proposal has now been scrapped. (Image Credit Supplied by Queensland Government)<\/figcaption><\/figure>\n\n\n\n<p><a href=\"https:\/\/www.couriermail.com.au\/sport\/brisbane-olympics-and-paralympics-2032\/alliance-of-stadium-architects-call-for-end-to-olympic-games-secrecy\/news-story\/7542de4579589a898d0bce9e882ccd18\" target=\"_blank\" rel=\"noreferrer noopener\">In an interview with the Courier Mail,<\/a>&nbsp;HKS Director Andrew Colling said the revamped Gabba could feature a timber shell with blended greenery and sandstone instead of a cookie-cutter concrete stadium.<\/p>\n\n\n\n<p>Mr Colling said the stadium could incorporate a parkland observation deck on its roof and a cocoon of timber and sandstone to &#8220;create something that&#8217;s not only distinctly South East Queensland but distinctly Australian.&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-1024x1024.jpg\" alt=\"\" class=\"wp-image-9673\" srcset=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-1024x1024.jpg 1024w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-300x300.jpg 300w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-100x100.jpg 100w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-600x600.jpg 600w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-150x150.jpg 150w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-768x768.jpg 768w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-1536x1536.jpg 1536w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-696x696.jpg 696w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-1068x1068.jpg 1068w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-1920x1920.jpg 1920w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-420x420.jpg 420w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central-1320x1320.jpg 1320w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/Andrew-Colling-of-HKS-Architects-is-leading-the-push-Photo-Credit-HKS-Architects-Wood-Central.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Andrew Colling of HKS Architects. (Photo Credit: Supplied by HKS Architects)<\/figcaption><\/figure>\n\n\n\n<p>Mr Colling said, &#8220;Timber will play a big role, and we&#8217;ll be celebrating the fact we love to be on timber verandas.&#8221;<\/p>\n\n\n\n<p>&#8220;I&#8217;d go as far as to say there&#8217;s no reason we couldn&#8217;t turn the roof into a park with an observation deck looking back to the city.&#8221;<\/p>\n\n\n\n<p>By opting for a greenfield (i.e. complete knockdown and rebuild) rather than brownfield refurbishment, Brisbane is now in an enviable position to create something unique.<\/p>\n\n\n\n<p>&#8220;We know the Gabba is not the easiest or cheapest choice for the government,&#8221; Mr Colling told the Courier Mail, &#8220;but it&#8217;s the right choice because if you look at where Brisbane will be in 20 years after the Olympics, it will be a global city.&#8221;<\/p>\n\n\n\n<p>The Queensland Government&#8217;s management of the Games has been under intense scrutiny, with Red Union Support Hub&#8217;s Chris Dekker accusing the government of making contract details &#8220;behind closed doors.&#8221;<\/p>\n\n\n\n<p>The Palaszczuk government had broken with precedent by keeping the Olympic Delivery Authority within the public service, however Premier Miles cancelled this arrangement after coming to power last December.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-embed-handler wp-block-embed-embed-handler wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\nhttps:\/\/youtube.com\/watch?v=ANs-SmOznPQ\n<\/div><figcaption class=\"wp-element-caption\">Footage courtesy of<a href=\"https:\/\/www.youtube.com\/@7news\"> @7News.<\/a><\/figcaption><\/figure>\n\n\n\n<h6 class=\"wp-block-heading\">Is a Timber Rich Stadium Possible?<\/h6>\n\n\n\n<p>According to Professor Greg Nolan, a timber design and construction expert, the answer is &#8216;yes&#8217;, but with caveats.<\/p>\n\n\n\n<p>Professor Nolan spoke to  ABC Radio Hobart Mornings host Leon Compton <a href=\"https:\/\/woodcentral.com.au\/could-timber-hold-the-key-for-tasmanias-new-afl-stadium\/\">in May<\/a> about building the new Macquarie Point AFL stadium in Tasmania out of timber.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.abc.net.au\/hobart\/programs\/mornings\/can-tasmanias-stadium-be-built-out-of-timber\/102321658?utm_campaign=abc_radio_hobart&amp;utm_content=link&amp;utm_medium=content_shared&amp;utm_source=abc_radio_hobart\">Listen to the full interview.<\/a><\/div>\n<\/div>\n\n\n\n<p>Professor Nolan said anything is possible when pointing to the Sydney 2000 Olympic Games, where a 100m clear span timber roof was installed over the Sydney Exhibition Building &#8211; which hosted the basketball.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"510\" src=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/he-exposed-timber-1-768x510.jpg.webp\" alt=\"\" class=\"wp-image-9674\" srcset=\"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/he-exposed-timber-1-768x510.jpg.webp 768w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/he-exposed-timber-1-768x510.jpg-600x398.webp 600w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/he-exposed-timber-1-768x510.jpg-300x199.webp 300w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/he-exposed-timber-1-768x510.jpg-696x462.webp 696w, https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/08\/he-exposed-timber-1-768x510.jpg-632x420.webp 632w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">At the time of construction, the domed roof at the Sydney Exhibition Building was, at the time of construction, one of the largest timber span roofs. (Photo credit: University of Tasmania)<br><\/figcaption><\/figure>\n\n\n\n<p>&#8220;You can build a timber-rich stadium, which means you use timber where best suited.&#8221;<\/p>\n\n\n\n<p>Multi-storey structures have ground floors laid in concrete and steel, with timber on the upper floors.<\/p>\n\n\n\n<p>&#8220;What has evolved is for the lower floors to have concrete structures, and then you spring up wood from above.&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-embed-handler wp-block-embed-embed-handler wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"youtube-embed\" data-video_id=\"Z0dnPEPlebU\"><iframe loading=\"lazy\" title=\"A Guide to Wood Construction Systems : Greg Nolan\" width=\"696\" height=\"392\" src=\"https:\/\/www.youtube.com\/embed\/Z0dnPEPlebU?feature=oembed&#038;enablejsapi=1\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<\/div><figcaption class=\"wp-element-caption\"><em>Professor Greg Nolan has previously presented a Guide to Wood Construction Systems. Footage courtesy of&nbsp;<a href=\"https:\/\/www.youtube.com\/@WoodSolutionsAustralia\" target=\"_blank\" rel=\"noreferrer noopener\">@WoodSolutionsAustralia<\/a><\/em>.<\/figcaption><\/figure>\n\n\n\n<p>This timber has a spanning capacity that is economically suited, he said.&nbsp;<\/p>\n\n\n\n<p>&#8220;It&#8217;s the same with concrete. So you build the first floors to suit the car parking and make a platform to go up with timber from that point.&#8221;<\/p>\n\n\n\n<p>Like two of the Brisbane stadiums under consideration, Macquarie Point is an oval with unique construction challenges.<\/p>\n\n\n\n<p>&#8220;You can get a whole range of timber products. You&#8217;ve got glue-laminated timber, cross-laminated timber, and you can form a plate or a slab,&#8221; Professor Nolan noted.<\/p>\n\n\n\n<p>&#8220;Not too dissimilar to a tilt slab or precast concrete panel, timber can be manufactured in a factory. Because it&#8217;s timber, it can be routed within a millimetre of accuracy and assembled on-site like a large panel set.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A committee reviewing Brisbane&#8217;s 2032 Olympic recommendation to scrap the controversial $2.7 billion Gabba redevelopment in favour of a new, &#8220;marginally more expensive&#8221; stadium at Victoria Park, Herston, has been rejected by the Queensland Premier. Instead, the Premier will push to retrofit and rebuild Lang Park, which will be used for the Opening and Closing [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":16274,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_wpscppro_dont_share_socialmedia":false,"_wpscppro_custom_social_share_image":0,"_facebook_share_type":"","_twitter_share_type":"","_linkedin_share_type":"","_pinterest_share_type":"","_linkedin_share_type_page":"","_instagram_share_type":"","_medium_share_type":"","_threads_share_type":"","_google_business_share_type":"","_selected_social_profile":[],"_wpsp_enable_custom_social_template":false,"_wpsp_social_scheduling":{"enabled":false,"datetime":null,"platforms":[],"status":"template_only","dateOption":"today","timeOption":"now","customDays":"","customHours":"","customDate":"","customTime":"","schedulingType":"absolute"},"_wpsp_active_default_template":true},"categories":[3,38,50,37,35,32,46,39,54],"tags":[],"ppma_author":[70],"class_list":{"0":"post-9670","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-architecture","8":"category-architecture-and-design","9":"category-australia","10":"category-building-and-construction","11":"category-case-studies","12":"category-global-news","13":"category-industry","14":"category-mass-timber","15":"category-queensland"},"authors":[{"term_id":70,"user_id":2,"is_guest":0,"slug":"jason","display_name":"Jason Ross","avatar_url":{"url":"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/01\/J-Ross-headshot.jpeg","url2x":"https:\/\/woodcentral.com.au\/wp-content\/uploads\/2023\/01\/J-Ross-headshot.jpeg"},"0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/posts\/9670","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/comments?post=9670"}],"version-history":[{"count":17,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/posts\/9670\/revisions"}],"predecessor-version":[{"id":21660,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/posts\/9670\/revisions\/21660"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/media\/16274"}],"wp:attachment":[{"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/media?parent=9670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/categories?post=9670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/tags?post=9670"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/woodcentral.com.au\/wp-json\/wp\/v2\/ppma_author?post=9670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}